Kubrick Group, SE1 (5,400 sq ft)

We joined the team in July 2019 at the tender return stage of the process, for the fit-out of a single floor which had already been finished to CAT A standard in Southwark.

The space had a raised access floor, but no suspended ceiling, with all services being exposed and the fit-out involved the construction of partitions, installation of suitable power and data, installation of a tea point, floor finishes, feature wall coverings in some areas and decorations to the entire space as required.

The fit out started at the end of July and was completed by mid-September 2019.